Full summer maintenance plan for industrial cooling towers

Article

March 24, 2025 / 3 min read time

As temperatures rise, industrial cooling systems are exposed to increased operational stress, and their efficiency can drop significantly if not properly maintained. A malfunctioning cooling tower can lead to equipment overheating, increased energy consumption, and unexpected shutdowns, which can seriously impact production.

 

To avoid these risks, a full inspection before the hot season and an effective maintenance plan are essential. Here’s what you need to do to ensure your cooling towers operate at peak capacity during the summer months. For details on year-round cooling tower maintenance, check out our seasonal guide.

 

 

Structural inspection and cleaning of cooling tower components

 

Before the hot season begins, a visual inspection of essential components can prevent costly failures.

 

  • Inspect the cooling tower structure – Identify signs of corrosion, cracks, or damage to the frame, fills, and water basin. Minor issues can quickly turn into major failures if not addressed in time.
  • Clean and disinfect components – Power wash fills and the water basin to remove scale deposits, dirt, and biofilm. Clean the distribution nozzles to ensure even water distribution.
  • Evaporative condensers for ammonia and freon – Remove deposits from cooling coils, check fan integrity, and replace worn components to prevent efficiency losses.

 

 

Checking and maintaining mechanical components of cooling towers

 

Dynamic components must function optimally to ensure efficient heat transfer.

 

  • Inspect fans and motors – Check fan blades for cracks or imbalance, lubricate bearings, and ensure proper alignment. Replacing worn belts helps prevent vibrations and reduces energy consumption.
  • Inspect electrical components – Tighten connections, test motors, and ensure thermal overload protection functions correctly.
  • Check pumps and spray nozzles – Pumps should be leak-free and fully operational. Clean or replace clogged nozzles to maintain optimal system efficiency.

 

 

Water Treatment – Preventing Corrosion and Deposits on Cooling Towers

 

Effective water treatment is crucial to prevent corrosion, scale buildup, and bacterial growth (such as Legionella).

 

  • Test and adjust water parameters – Monitor pH, hardness, and chemical concentrations. Use biocides, corrosion inhibitors, and anti-scaling agents to maintain the chemical balance of the water. Overdosing is a common issue that causes corrosion and unnecessarily increases operational costs.
  • Biological decontamination – Apply a biocide shock treatment to prevent algae and harmful bacteria growth. Ensure impurity removal systems work properly to prevent hazardous microorganism accumulation.
  • Maintain self-cleaning filters – Check filters for suspended solids in the cooling circuit. Replace worn components, such as screens, pump rotors, and gaskets, to prevent blockages.

 

 

Optimizing Performance and Reducing Energy Consumption

 

System efficiency can be improved by properly managing airflow and water flow.

 

  • Monitor water flow rate – Ensure water flow is within the manufacturer’s recommended range. Too little or too much flow can affect heat exchange efficiency, influencing cold water temperature.
  • Adjust fan speeds – Variable-speed fans can reduce energy consumption and optimize performance based on cooling demand and external atmospheric conditions (day vs. night operations).
  • Heat recovery – Implementing a heat recovery system from wastewater can significantly cut operational costs, using available energy for other industrial processes.

 

 

Renting Water Treatment Equipment to Cover Seasonal Demands

 

If you need extra cooling capacity during the hot season or backup equipment to prevent unexpected shutdowns, renting can be a flexible and cost-effective solution.

 

  • Mobile cooling towers – Ensure continuous operations in case of increased demand or maintenance work.
  • Temporary heat exchangers – Optimize heat transfer and prevent overheating of the serviced equipment.
  • Water filtration systems – Maintain high water quality, preventing deposits that could impact cooling tower performance.

 

Renting these systems ensures flexibility, reduces risks associated with peak seasons, and minimizes production downtime. For immediate needs, we offer a wide range of rental equipment.

 

 

Final thoughts: Why cooling tower preparation for summer is essential

 

Preparing cooling towers for the hot season is essential to:

 

  • Prevent unexpected failures
  • Optimize energy consumption
  • Extend equipment lifespan

 

Proper maintenance, effective water treatment, and systematic component inspections prevent problems before they occur.

 

Need technical support for cooling tower preparation before summer? Contact our team for consultation, maintenance services, and equipment rentals!